Preventive Maintenance Schedule for Hospital Biomedical Equipment
A step-by-step approach to planning biomedical equipment preventive maintenance: build the inventory, prioritise by risk, set tasks and intervals from manufacturer guidance, keep audit-ready records, with a sample schedule to adapt.

A preventive maintenance schedule for biomedical equipment is a planned calendar of inspections, servicing and calibration for every device in the hospital, with the frequency for each set mainly by the manufacturer’s recommendations and the risk the device poses to patients. Building one starts with a complete inventory, then a decision on which equipment needs planned maintenance, then the tasks and intervals, and finally a records system that shows what was done and when the next visit is due.
This guide walks through those steps and includes a sample schedule that biomedical teams can adapt.
What does preventive maintenance include?
The World Health Organization’s Medical equipment maintenance programme overview, part of its Medical Device Technical Series, describes a maintenance strategy as including procedures for inspection, as well as preventive and corrective maintenance. Performance inspections confirm the equipment works correctly, safety inspections confirm it is safe for patients and operators, and preventive maintenance aims to extend equipment life and reduce failure rates.
In practice, a planned visit for a single device usually combines several of these:
- Inspection: housing, cables, connectors, mounts, labels, accessories.
- Preventive tasks: cleaning, replacing filters, seals, batteries and other wear parts at the intervals the manufacturer sets.
- Performance verification or calibration: measuring output against a calibrated reference analyser.
- Electrical safety testing: protective earth, leakage current and insulation resistance.
- Documentation: a service record and, where calibration is done, a certificate.
Corrective maintenance, or repair, is what happens when something has already failed. A good PM programme reduces how often that is needed and catches wear before it becomes a breakdown.
Step 1: Build an accurate equipment inventory
You cannot schedule what you have not listed. WHO’s laboratory quality guidance on equipment maintenance recommends an inventory that records, for each item, the instrument type, make, model and serial number, along with purchase details, vendor contacts, warranty expiry, and whether documentation, spare parts and maintenance contracts are in place. It also suggests doing the inventory room by room and recording each item’s condition as functional, partially functional or non-functional.
For a hospital, add the department and location, the asset number and the date of the last service. Many teams also note whether the unit is life-support equipment, because that affects priority.
Step 2: Decide which equipment needs planned maintenance
Not every device needs the same attention. A risk-based approach puts more effort where failure would do the most harm. A widely used method, described by Fennigkoh and Smith in 1989, scores each device type on four factors:
- Equipment function: life support at the top, down to non-patient equipment.
- Physical risk: what could happen to a patient or user if the device failed.
- Maintenance requirements: how much routine upkeep the device needs.
- Incident history: how often this type of device has had problems.
Ventilators, defibrillators, anaesthesia machines and infusion devices score high on function and risk, so they sit at the top of any schedule. Whatever method you use, write it down and apply it consistently. Assessors are generally more interested in a documented, reasoned approach than in a particular formula.
Step 3: Set tasks and intervals
The manufacturer’s service manual is the primary reference for both the tasks and how often to do them. WHO’s laboratory guidance notes that manufacturers usually specify maintenance tasks at daily, weekly, monthly or yearly intervals, and that following them helps equipment perform as intended and last longer.
Some intervals are based on operating hours rather than time. ECRI’s inspection procedure for intensive care ventilators, for example, uses a 12-month interval but advises following the manufacturer’s schedule, which may be hours-based, and recording the hour meter reading at each visit.
Adjust intervals with evidence. If a device type repeatedly fails between visits, shorten the interval or add tasks. Heavy use, dusty environments, unstable power supply and high ambient temperatures can all justify more frequent checks.
Separate user checks from engineer visits
Some checks belong with clinical staff, not engineers: a daily look at a defibrillator’s readiness indicator, a ventilator’s pre-use check, cleaning between patients. Put these on a ward checklist so they are not forgotten, and keep the engineer’s planned visits for inspection, parts replacement, calibration and safety testing.
Sample preventive maintenance schedule
This table is an example only. It shows how a schedule can be laid out. The intervals are starting points to compare against each manufacturer’s service manual and your own risk assessment, not recommendations for any specific model.
| Equipment | User checks (clinical staff) | Planned PM visit (engineer) | Performance check or calibration | Electrical safety |
|---|---|---|---|---|
| Ventilator | Pre-use check as per manual | As per manufacturer, by time or operating hours; replace filters and sensors as specified | Example: every 12 months and after repair | At each PM visit |
| Defibrillator / AED | Check readiness indicator, pads expiry, battery status each shift or day | As per manufacturer | Example: every 6 to 12 months and after repair | At each PM visit |
| Patient monitor | Check cables, probes and alarms before use | As per manufacturer | Example: every 12 months | At each PM visit |
| Infusion pump / syringe pump | Visual check, battery indicator, occlusion alarm on set-up | As per manufacturer | Example: every 12 months and after a drop or fluid ingress | At each PM visit |
| Anaesthesia machine | Pre-use machine check each day or session | As per manufacturer | Example: every 6 to 12 months | At each PM visit |
| Electrosurgical unit | Check cables, return electrode and alarms before each list | As per manufacturer | Example: every 12 months | At each PM visit |
| ECG machine | Check leads and print quality | As per manufacturer | Example: every 12 months | At each PM visit |
| Infant incubator | Check temperature display and alarms before use; clean between patients | As per manufacturer | Example: every 6 to 12 months | At each PM visit |
| Oxygen concentrator | Clean intake filter as per manual | As per manufacturer; replace filters as specified | Example: every 12 months (oxygen purity and flow) | At each PM visit |
A copy of the schedule should sit with each department, and every device should carry a label showing when its next service is due, as WHO’s laboratory guidance also recommends.
For detail on what a calibration visit covers for individual devices, see our guides to defibrillator calibration and energy testing and ventilator calibration parameters.
Step 4: Keep records that stand up to an audit
Each planned visit should produce a record showing the device, the date, the engineer, the tasks done, parts replaced, measured results against limits, the reference equipment used and the next due date. Where calibration is part of the visit, the calibration certificate should be filed with the record.
A spreadsheet works for a small facility. Larger hospitals usually move to a computerised maintenance management system, which can generate work orders, track overdue items and report completion rates by department.
Records also feed back into planning. If the same fault appears across several units of one model, that is a reason to review the interval, the user checks or the supplier. Our NABH calibration requirements checklist covers the documentation assessors usually ask for.
What should happen when a device fails its PM check?
Agree the procedure in advance so nobody has to decide on the spot:
- Label the device clearly as out of service and remove it from the clinical area.
- Inform the department head and arrange a replacement unit if one is available.
- Raise a corrective maintenance request and record the fault.
- After repair, repeat the performance and safety checks before the device returns to use.
- Close the record with the repair details and the new test results.
The last two steps are the ones most often skipped. A repaired device that has not been re-tested has no evidence that it is safe to use.
Safety note: This article is general guidance. Always follow the manufacturer’s service manual for each device, and have maintenance, calibration and safety testing done by qualified engineers using calibrated analysers.
Help with planned maintenance and calibration
At Shiwi Enterprises, the same engineering team handles calibration, repair and preventive maintenance. Planned visits are designed to catch wear early and keep service records up to date, and our NABL-accredited laboratory (ISO/IEC 17025) issues a calibration certificate for each instrument. We work on-site with hospitals, labs and clinics across India, including small towns and villages. Read more about our repair and preventive maintenance services, see the equipment we cover, or request a quote for your inventory.
Frequently asked questions
What is included in biomedical equipment preventive maintenance?
Planned inspection, cleaning and replacement of wear parts at the intervals the manufacturer specifies, plus performance verification or calibration against a reference analyser, electrical safety testing and a service record. WHO describes a maintenance strategy as including inspection, preventive maintenance and corrective maintenance.
How are preventive maintenance intervals decided?
The manufacturer's service manual is the primary reference. Intervals can then be adjusted using a documented risk assessment and the device's own fault history, and some equipment, such as ventilators, may have intervals based on operating hours.
Which equipment should be prioritised in a PM schedule?
Equipment with the highest function and patient risk, such as ventilators, defibrillators, anaesthesia machines and infusion devices. A common risk-scoring method, published by Fennigkoh and Smith in 1989, considers equipment function, physical risk, maintenance requirements and incident history.
What records should be kept for preventive maintenance?
For each visit: device identification, date, engineer, tasks done, parts replaced, measured results against limits, reference equipment used and the next due date, with the calibration certificate filed where calibration was performed.
Request a calibration quote
List your equipment with make, model and quantity, and tell us your city. We reply with a quote and a visit plan.
Keep reading
All articles-
Calibration What Is Medical Equipment Calibration and How Often Should It Be Done?
What medical equipment calibration involves, which devices need it, and how to set calibration intervals based on manufacturer guidance, risk, usage and calibration history.
-
Compliance NABH Medical Equipment Calibration Requirements: A Checklist for Hospitals
A practical checklist for NABH coordinators and biomedical engineers covering equipment inventory, calibration schedules, certificates, electrical safety and the records assessors ask for.
-
Compliance NABL vs Non-NABL Calibration: What Hospitals Should Know
How NABL-accredited and non-accredited calibration differ in scope, traceability and audit value, and how hospitals can tell which kind of certificate they hold.